
350 Cable Survey System
DPN 402197 © TSS (International) Ltd Page 2 of 26
9.1 CIRCUIT DESCRIPTION
The sub-sea installation consists of two principal parts:
❐ The array of sensing coils
❐ The Sub-sea Electronics Pod (SEP).
Additionally, the sub-sea installation might include an altimeter.
Figure 9–1 shows how these are interconnected.
Figure 9–1: Simplified interconnection diagram – Sub-sea installation
section 10 includes the electrical drawings for the System.
Kommentare zu diesen Handbüchern