DPN 402197 © TSS (International) Ltd Page 13 of 14
3.3 INSTALLATION CHECK LIST
Follow all the installation instructions in this Manual carefully.
Mount the coil triads in the correct orientation and in the correct place on board the
ROV. Ensure the coil array is central on the ROV.
Protect the coil array from collision damage by mounting it approximately one
metre above the lowest point on the ROV.
Make certain there is at least 0.5 metres clearance between the coils and the ROV
body.
Do not allow any free movement in the coil triads, the SEP, the altimeter or the
cables.
Always use the nylon mounting block when you install the SEP.
When you select a location to install the altimeter, consider its minimum range
measurement specification.
Avoid installing your altimeter where there is a significant horizontal offset dis-
tance between it and the coil array. Make certain there is less than 1.0 metres ver-
tical offset between the altimeter and the coil array.
Record all installation-specific configuration details in the Survey Log.